Friday, April 16, 2010

I'm nearly done with the electrical work on the project at the shop. The only thing left to do is to run electrical wires for a 220v water heater. Need to know where they want the disconnect box. Oh, I spent the rest of the day, sanding spackle from the walls. I over did it. Guess I don't know my own strength. The masons have to redo the spackle on the sanding that I just did. LOL...Oh well...I'm an electrician not a mason. I guess that's an extra day for that project to be done.

1 comment: